一个装修商的quotation, 请大家看看哪些水分比较多?



ITEM DESCRIPTION AMOUNT

A Works Descriptions

2 To supply & adding another door step at main entrance c/w matching tiles $ 120.00
3 To supply & overlay floor tiles at master toilet $ 450.00
4 To supply and install 1 set of aluminium main gate $ 420.00
5 To supply and install normal hollow core wooden main door c/w lockset & stopper $ 450.00
6 To supply and install 1 no of wash basin c/w tap & outlet piping $ 210.00
7 To supply and install 1 no of wash basin c/w tap & outlet piping at kitchen $ 210.00
8 To provide labour only to install towel hanger & mirror at 2 toilets $ 60.00
9 To supply & install to replace a toilet bowl at master toilet $ 300.00
10 To provide labour only to remove 1 no of wash basin from common toilet $ 40.00
11 To supply & install aluminium frame arcrylic panel sliding door at common toilet
12 Provide labour only to remove bamboo hanger & install in kitchen $ 30.00

14 To supply & erect 2 sided plaster fibre gypsum board partition to construct a new room c/w door frame & wooden hollow classic door with lockset & stopper $ 890.00

16 To provide labour only to paint of internal walls & ceilings for 1 hall & 2 bedrooms including new erect partition wall (Paint supply by owner) $ 700.00
17 To polish & re-varnish marble floor for 1 hall & 2 bedrooms $ 800.00
18 To supply and apply general cleaning for kitchen floor tiles & 2 toilets $ 120.00
19 To supply & install 1 nos of stainless-steel flush type rubbish chute $ 170.00
20 To provide haulages & debris clearing services $ 300.00
21 To fabricate & install solid surface cooking plateform (L=3ft) c/w solid plywood base $ 360.00
请先 登录 后评论

2 个回答

卢辰亨

looks not cheap
you may ask for a discount of 10% according to the quotation.

Especially, most of the time, item 18 (clearning), should be free.
item 20 (haulages & debris) clearing service), check with the local town council
or HDB branch, should be standard price, less than $300. The contractor has
no reason to make money from this item.

请先 登录 后评论
申壮利

polish & re-varnish marble floor for 1 hall & 2 bedrooms $ 800.00,磨地太贵了
1:For item 2: To supply & adding another door step at main entrance c/w matching tiles $ 120.00
可以让contractor做好step,然后自己买tiles,让contractor粘上去,这样的话价钱应该会省点

2:For item 3: To supply & overlay floor tiles at master toilet $ 450.00 觉得overlay 有点贵

3:For item 17: To polish & re-varnish marble floor for 1 hall & 2 bedrooms $ 800.00,磨地太贵了

请先 登录 后评论
  • 0 关注
  • 0 收藏,414 浏览
  • 金承 提出于 2019-07-19 18:42