住兀兰的同志有福了 - 汤申地铁线将让许多居民受惠 (z)

议员:汤申地铁线将让许多居民受惠

  (联合早报网讯)交通部长吕德耀今早在一个活动上宣布汤申地铁线的路线与地铁站已确定,从兀兰北到滨海湾花园,全线共有22个地铁站,包括6个转换站。

  据新明日报报道,出席活动的议员们都对新的地铁线表示欢迎,认为许多居民将因此受惠。

  碧山大巴窑集选区议员杨莉明说:“我对新民和汤申上段两站感到特别期待,前者靠近光明山,逢年过节有许多人前往祭拜,而且靠近碧山公园,新地铁站能舒缓拥挤,估计两万户居民将受惠。”

  三巴旺集选区议员李玉云律师说:“目前兀兰的巴士常常很拥挤,等候时间长,加上靠近柔佛,来往的人使交通更拥挤。有了兀兰南和兀兰北两站,人们能转搭地铁,相信能舒缓这个情况。”

  (详情见今日《新明日报》)
请先 登录 后评论

2 个回答

雷中

兀兰南和兀兰北
兀兰北在共和理工学院
兀兰南在体育学校附近

请先 登录 后评论
雷中

Thomson Line to open from 2019 with 22 stations(Z)
SINGAPORE: Singapore's sixth MRT Line -- the Thomson Line (TSL) -- will open from 2019, instead of the indicative timeline of 2018 announced in the Land Transport Master Plan. Pearl's Centre in Eu Tong Sen Street, a post office along Upper Thomson Road and two landed properties along Stevens Road and Robin Close will be affected by land acquisition. Minister for Transport Lui Tuck Yew, who gave an update on the Thomson Line on Wednesday, said the change in timeline is to accommodate some adjustments made to the original plan. Under the final rail alignment plan of the Land Transport Authority (LTA), the TSL will be longer and have more stations. It will be 30 kilometres long -- 3 kilometres longer than envisaged -- and have 22 stations, four more than originally planned. TSL will run from Woodlands in the north to Marina Bay in the south and is expected to be built at estimated cost of around S$18 billion. It is expected to have daily ridership of 400,000 commuters. Six of the 22 stations will be interchanges, enabling commuters to reach their destinations in the shortest possible time. For example, a resident of Sin Ming travelling to Republic Polytechnic in Woodlands will half his or her commute time from 50 minutes to 25 minutes. With six interchange stations, the TSL will connect to all existing lines and the future Downtown Line (DTL). TSL will connect to the North South Line at Woodlands and Orchard stations. Caldecott Station will connect to the Circle Line. Residents of the Bukit Timah stretch can change trains at the future DTL Stevens Station to connect to the TSL. The Outram Park Station will connect the TSL to the East West Line and North East Line, while the Marina Bay Station will connect the TSL to the North South Line and Circle Line. TSL will open in three stages from the north to the south. Phase One, which will have three stations from Woodlands North to Woodlands South, will open in 2019. Phase Two will be ready in 2020, with stations from Springleaf to Caldecott. The final stretch of 13 stations from Mount Pleasant to Gardens by the Bay will open in 2021. The line will also be a four-car system, instead of a three-car system. Mr Lui said this will give it additional capacity to cope with any increase in long-term demand. He was speaking during a visit to Telok Ayer Station of Downtown Line One. LTA, Singapore Land Authority (SLA) and the Urban Redevelopment Authority (URA) said in a joint statement that while all efforts have been made to minimise land acquisition, the government will acquire four full lots. They include Pearl's Centre in Eu Tong Sen Street, a post office along Upper Thomson Road and two landed properties along Stevens Road and Robin Close. Pearl's Centre will be affected by the construction of the TSL as a tunnel will run under part of the building. To optimise land use around the future TSL station at Outram Park, Pearl's Centre will be acquired and integrated with the adjoining state land for a high-density mixed-use development. Five other part lots will also be acquired but will not affect the main building structure. The SLA gazetted the land affected by acquisition on Wednesday.

请先 登录 后评论
  • 0 关注
  • 0 收藏,339 浏览
  • 雷中 提出于 2019-07-19 16:07